13,371 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Modifications to existing mechanical system for suite 2410.
Proposed renovation @12th floor apt#12d, not limited to removal/ installation of non-load bearing partitions, replacement of existing ceiling, replacement of existing interior fini…
Self-cert 2019 cbrc; renovate & expand the carry-out pizza restaurant business, group b, within the 1st floor of the existing 3-story masonry & frame building, type va, with r2 apa…
Self-cert 2019 cbrc: interior alterations to existing 1-story retail building for new physical therapy facility. work includes new partitions, electrical, hvac with new rtu, and pl…
Self-cert 2019 cbrc: alteration / upgrade hvac system design & associated electrical for existing chicago public library (occupancy group a-3) ; type 1a construction)
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Building 1 2870 sf 2 story single family residence. 3 Bdrm 3.5 Bath pool and spa. Detached 2 car garage with 503 sf one bedroom one bath residence on the second floor
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [5bed 4bath] with Attached Garage.
Replacement of existing webster burner with new dual fuel weishaupt burner in mobile boiler trailer unit # 01. the existing mobile boiler trailer was filed with nyc dob under dob #…
Replacement of existing webster burner with new dual fuel weishaupt burner in mobile boiler trailer unit # 02. the existing mobile boiler trailer was filed with nyc dob under dob #…
Installation of (1) outdoor condenser unit and (5) indoor air handling units for a split hvac system, including ductwork, diffusers, condensate drains, refrigeration piping with in…
Existing one (1) oil operated boiler replace with one (1) gas operated hot water boiler & accessories in cellar floor existing boiler room area. install new gas pipe for new boiler…
Modifications to the existing HVAC system (ATS Room) in the cellar as per plans. No change to use, egress or occupancy.
Replacement of complete existing central heat and air system with or without duct work
HVAC system for Apartment #8W on the 8th floor. No change to use, egress or occupancy.
Additions/Modification to the existing HVAC system on the 18th Floor-Suite-1801 ( Viabizzuno Ste) as per plan. No change to use, egress or occupancy
Laundromat demolition. work includes remove exist'g washers, exist'g dryers, exist'g h.w. boiler w/ tanks, exist'g sprinkler heads.
Mechanical systems associated with boiler replacement.
Filing for mechanical work at unit 10A on the 10th floor. No change to use, egress, or occupancy.
Construct alterations to King County Metro sewer station per plan. Mechanical included.
Replacement of existing chillers with new air-cooled modular chillers. Replacement of three existing air-conditioning units in kind with portion of associated ductwork. BMS system…