13,371 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Replacement of HVAC equipment (Vacuum pump, condensate pump)
Filing herewith mechanical work for the building at the address listed. includes new toilet exhaust systems. no change to use, egress, or occupancy.
Ps 079q, installation of temporary chimney, steam, condensate, and water piping to connect temporary boiler during renovation of main building heating plant in nyc public school in…
Installation of three (3) new boilers, burners, breeching, fan, and associated piping / wiring / controls. No change in use, egress or occupancy.
Installation of mechanical equipment as per plans. no change in use, egress, or occupancy.
Remove & replace concrete pad for equipment. new structural steel boiler access platform and ladder for boilers.
Mechanical changes as indicated on plans; including the installation of (1) Water Cooled Heat Pump.
Replacement of complete existing central heat and air system with or without duct work Removed the old unit and installed 1 new HVAC system without ductwork
NYCHA BOILER_BLDG#12_Remove and replace heat exchangers, and remove and replace hot water heating system connected to heat recovery system in existing tank room.
Ventilation work, duct distribution as per plans filed herewith. No change to use, egress or occupancy.
Mechanical plans filed in conjunction with Alt2 job #321613465. Legalization to resolve violation 35307205H
Mechanical changes as indicated on plans.
Work includes the heating, ventilation, and air conditioning space as purposed in plans.
Renovation of cellar mechanical rooms - nycha boilers
BLDG#1_Remove and replace heat exchangers, and connect heat recovery system to existing instantaneous hot water heating in the existing tank room.
Ps 004r, installation of temporary chimney, steam, condensate, and make-up water piping to connect temporary mobile boiler during renovation of main building heating plant in conju…
K313, installation of temporary hot water supply /return and make-up water piping to connect a mobile boiler trailer to provide heat during the heating season in conjunction with r…
Renovation and replacement of HVAC equipment at cellar mechanical room as shown on the drawings provided.
Filing Mechanical Application Subsequent to primary job number X01265999-I1
Replacement of complete existing central heat and air system with or without duct work