13,618 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
basement bathroom remodel. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR COND…
Primary Bath Install new Panasonic Whisper Green Select (Model #: FV0511VK2) bath fan in primary bath. Location TBD at install. Connect to existing venting. Ensure venting is up to…
Remove and Replace Furnace. Add 3 Supplies and 1 Return
Furnace and AC replacement
Furnace replacement
bathroom remodel 1st floor. Building Code: 2020 MNSBC/2018 IRC Energy Code: MINNESOTA RULES CHAPTER 1322 SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, AND HEATING/AIR CON…
Change out furnace
Install mitsubishi ductless mini split- single head
replace centrifugal chiller
Boiler replacement
Ductless mini split install
Floor supply on main floor
1.5 Ton Elite Series EL15 Single Stage Air Conditioner Up To 16 SEER2
We are replacing 12 existing cast iron radiators with 12 new cast iron radiators. Existing radiators cracked and had frozen due to boiler failure.
3-zone mini-split system
Replace furnace and ac
furnace replacement
install mini split system to 2nd floor-4801 16th Ave S
install ductless mini split to first floor
New Construction - FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURER’S SPECIFICA…