13,498 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Replacement of complete existing central heat and air system with or without duct work Sue Slaughter - replace existing 2.5-ton vertical gas split system
Installation of new boiler at cellar floor. no change to use, egress or occupancy. application previously filed & approved under x00490662-z1, however was filed as replacement inst…
*SmartHousing**Green Building*: New construction of 2 story sfr condo - 2 bedrooms 2.5 baths attached garage w/ covered porch
Modification to existing HVAC systems as per plans filed herewith. No change in use, egress or occupancy.
AISD PROJECT - Addition of new packaged HVAC equipment to be installed on top of new 145 SF concrete equipment pad to service existing warehouse building. Pad 1
Proposed installation of HVAC units, exhaust duct, SS Hood, and exhaust fan, including all incidental general construction work associated with the mechanical installation.
Interior remodel of an existing building to a new restaurant.
**LAX**APM**Alterations to the existing adjoining rooms R-160 & R-161 within the first floor of the existing CONRAC (LAX Rental Car Center). The room will require the removal of th…
Install (7) new boilers for existing 5-family dwelling and (1) commerical store in cellar as per plan. no change in use, egress or occupancyunder this application.
Addition/Interior Remodel - Primary bathroom remodel primary closet addition to existing house. New accessory building with exercise room guest room and bathroom.
Oil to gas conversion, install new boiler and indirect hw tank with reconnection to existing distribution in cellar.
Mechanical systems in conjunction with alt-co job number # b07994345-i1. installation of (3) air conditioner units and minor mechanical work as per plan.
Remove existing fuel oil storage tank as per plans. no change in use, egress or occupancy.
Supplemental permit to complete work done under previously expired permit #15014-10000-05450. Work is 95% complete (Minimum 75% percent completed as determined by inspection). Incl…
*Smart Housing**Green Building*: New construction of 3 story duplex condo each with 2 beds 2.5 baths attached garage covered patio and balcony (Unit B)
Modifications to the existing HVAC system on the the 34th floor as per plans. No changes to Use, Egress, or occupancy.
Replacement of complete existing central heat and air system with or without duct work
Remove existing AC units, ductwork and associated components.
installation of new mechanical piping, and all accessories related to the new gas fired hot water heaters. installation of new condensate pumps for existing heating system as per p…
installation of new mechanical piping, and all accessories related to the new gas fired hot water heaters. installation of new condensate pumps for existing heating system as per p…