13,498 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
installation of new mechanical piping, and all accessories related to the new gas fired hot water heaters. installation of new condensate pumps for existing heating system as per p…
Structural analysis to support new mechanical equipment installations
install mini split system on building addition pod
1 BOILER REPLACED ON INITIAL FILING, 1 NEW BOILER INSTALL ON SUBSEQUENST FILNG. IN CONJUNCTION TO PL FILING FOR GAS PIPING M01055178-I1 no change to use egress or occupancy ALL WOR…
1 BOILER REPLACED ON INITIAL FILING, 1 NEW BOILER INSTALL ON SUBSEQUENST FILNG. IN CONJUNCTION TO PL FILING FOR GAS PIPING M01055178-I1 no change to use egress or occupancy ALL WOR…
Replacement of complete existing central heat and air system with or without duct work replace existing 4-ton vertical gas split system with new 4-ton air conditioner two-stage 90…
Replacement of complete existing central heat and air system with or without duct work
Mechanical work as per plans.
Mechanical specifications filed in conjunction with gc b01220978-i1
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work HVAC change out
*Smart Housing**Green Building*: New construction of 3 story duplex condo each with 2 beds 2.5 baths attached garage covered patio and balcony (Unit A)
Proposed vertical and horizontal to existing two story and cellar, one-family dwelling. interior renovation. new partitions, finishes, doors, windows, kitchen cabinets, and new hva…
2A Elev.: Modification of HVAC equipment and ductwork to accommodate alteration to the existing elevator doors and lobbies as per plans. no change to use, egress or occupancy.
1A Elev.: Modification of HVAC equipment and ductwork to accommodate alteration to the existing elevator doors and lobbies as per plans. no change to use, egress or occupancy.
Replacement of complete existing central heat and air system with or without duct work
Installation of new HVAC equipment and ductwork
Expansion of #407 to #408 medical office for sleep apnea
install minisplit inside pod addition
Replacement of condenser only replacement of condensers only units 103105206108209110112214216116117and 201