13,661 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
1 BOILER REPLACED ON INITIAL FILING, 1 NEW BOILER INSTALL ON SUBSEQUENST FILNG. IN CONJUNCTION TO PL FILING FOR GAS PIPING M01055178-I1 no change to use egress or occupancy ALL WOR…
1 BOILER REPLACED ON INITIAL FILING, 1 NEW BOILER INSTALL ON SUBSEQUENST FILNG. IN CONJUNCTION TO PL FILING FOR GAS PIPING M01055178-I1 no change to use egress or occupancy ALL WOR…
General Construction for mechanical systems removal as shown on plans submitted herewith. DEV HUB CONSULTATION COMPLETED 1/22/24- Rami Bitar
Propose to install ductless split units for the medical office on first floor.
Filing herewith Mechanical work on the 13th FL. as per plans filed herewith. No change to use, egress or occupancy.
Application filed for mechanical additions/modifications on the partial 22nd floor as per plans filed herewith. no change in use, egress, or occupancy.
Modifications to existing HVAC system and ductwork including installation of new AC units. No change in use, egress or occupancy.
Replacement of complete existing central heat and air system with or without duct work replace existing 4-ton vertical gas split system with new 4-ton air conditioner two-stage 90…
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Install 6 4 ton package units
installation of new mechanical piping, and all accessories related to the new gas fired hot water heaters. installation of new condensate pumps for existing heating system as per p…
Structural analysis to support new mechanical equipment installations
Replacement of complete existing central heat and air system with or without duct work 4-TON CONDENSER CHANGE-OUT IN BACKYARD & 88K BTU FURNACE CHANGE-OUT IN ATTIC
Mechanical work as shown on plans filed herewith.
Provide services to support Mechanical equipment removals and new installations
Mechanical work as per plans.
Interior remodel change of use 2 story duplex conversion into a single family residential
Filing for new boilers and gas meters in the cellar
Provide services to support Mechanical equipment removals and new installations
Install (7) new boilers for existing 5-family dwelling and (1) commerical store in cellar as per plan. no change in use, egress or occupancyunder this application.