13,661 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Repair/replacement affecting 1 systems : 2 boiler - hot water(laars magnatherm cfh1000nha1xx - mechanical room on main floor) 2 boiler - hot water(laars ntv500 - mechanical room on…
Replacement of complete existing central heat and air system with or without duct work
Replace an existing diesel Option generator Automatic Transfer Switch Docking Station and install stairs/platform on new concrete apron on existing equipment pad. Site plan exempti…
Replacement of complete existing central heat and air system with or without duct work HVAC change out
Replacement of complete existing central heat and air system with or without duct work Sissy Cox (APT 127) - replacement for 2-ton vertical gas split HVAC system
Remove existing AC units, ductwork and associated components.
Installation of mechanical systems including a new AC units, ducts and associated piping as per plans filed herewith. No change in use, egress or occupancy.
Kitchen remodel for residential buildings (no structural changes). Combine with electrical, hvac, plumbing
Mechanical work for ING Financial on 10th and 11th floor
installation of new mechanical piping, and all accessories related to the new gas fired hot water heaters. installation of new condensate pumps for existing heating system as per p…
Replacement of complete existing central heat and air system with or without duct work Install 6 4 ton package units
Replacement of complete existing central heat and air system with or without duct work 4-TON CONDENSER CHANGE-OUT IN BACKYARD & 88K BTU FURNACE CHANGE-OUT IN ATTIC
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
1 BOILER REPLACED ON INITIAL FILING, 1 NEW BOILER INSTALL ON SUBSEQUENST FILNG. IN CONJUNCTION TO PL FILING FOR GAS PIPING M01055178-I1 no change to use egress or occupancy ALL WOR…
1 BOILER REPLACED ON INITIAL FILING, 1 NEW BOILER INSTALL ON SUBSEQUENST FILNG. IN CONJUNCTION TO PL FILING FOR GAS PIPING M01055178-I1 no change to use egress or occupancy ALL WOR…
Modifications to existing HVAC system and ductwork including installation of new AC units. No change in use, egress or occupancy.
STRUC/ELEC/PLMB/MECH - COMMERCIAL REMODEL - Building
STRUC/ELEC/PLMB/MECH - COMMERCIAL TI - Building
STRUC/ELEC/PLMB/MECH - COMMERCIAL MISCELLANEOUS - Building