5,219 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
NYCHA BOILER -Dyckman. Building3: Architectural work to include Sealant, firestopping, patching, wall repairs in rellation to Boiler replacement as per plans filed herewith.
Restore gas to boilers.
Replacement of existing heating hot water circulation pumps, ventilation shaft cleaning and balancing.
NYCHA Boilers: Dyckman Building3: Mechanical work in association with Boiler Replacement as per plans filed herewith. No change to use, egress or occupancy.
NYCHA Boilers Dyckman: Building 3: Site/Civil work as per plans filed herewith. No change to use, egress or occupancy.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Installation of new mini split system residential hvac in combined dwelling units on 2nd floor.
Herewith filing for mechanical modifications in conjunction with interior retail fit-out per plans. no change in use, occupancy or egress under this application.
Mechanical modification to include HVAC replacement and replacement of associated ductwork, filed in conjunction with GC # B08031174-I1. No change of use, occupancy or egress under…
Interior Demo of existing Mechanical Ductwork and related equipment on thr 3rd Floor as per plans submitted herewith. No Change to Use, Occupancy Group, or Egress.
NYCHA Boiler: Dyckman: Building 4: Architectural work to include Sealant, firestopping, patching, wall repairs in relation to Boiler replacement as per plans filed herewith
Installation of breeching for boiler replacement. no change to use, egress or occupancy.
Application filed here to propose mechanical systems work type in conjuctionwith b01170940-i1
NYCHA Boilers: Dyckman: Building Building4: Mechanical work associated with boiler replacement as per plans filed herewith.
Register existing gas boiler originally filed under 120581138
NYCHA BOILERS: DYCKMAN: Building 4: Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues a…
Install (3) new gas-fired furnaces with refrigeration coils and (3) new condenser units as per plans. no change in use, occupancy or egress.
NYCHA BOILER- BLDG # 3- Architectural work being filed in conjunction with Cooper Houses and all related applications.
Mechanical work for Liberty Mutual on 10th floor
Nycha boiler- building 10-provide loose lintel for louver opening on masonry wall; repair and extend concrete pad; provide boiler access platform.
NYCHA BOILER- BLDG # 4- Architectural work being filed in conjunction with Cooper Houses and all related applications.