5,298 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Replace ex. boiler & hwh with new combi-boiler at cellar; replace existing stove at 1st floor. superseding prior laa application job#q01336665-i1. no change in use, occupancy or eg…
Modifications to the existing HVAC System: Installation of new ductwork, VAV's, FCU's and associated equipment on the 5th Floor as per plans (MUFG Renovations.) No change to use, e…
Modification to existing hvac system as per plans filed herewith. no change in use egress or occupancy.
Herewith filing for mechanical ductwork modification on 3rd floor as per plans filed herewith. no change in use, occupancy or egress.
Mechanical changes as indicated on plans.
Minor modifications to natural gas piping to bring boiler room up to code.
Installation of new electric hvac and split systems for existing (1) one family dwelling unit.
Modificagtion to existing mechanical system, diffuser, ductwork and related piping as shown on drawings. no change to use, egress or occupancy.
Mechanical modificaiton (melius) as indicated on plans filed. no change in use, egress or occupancy.
INTERIOR BUILD-OUT OF COMMERCIAL SPACE (UG-6 / VI): MINOR PARTITION WORK, NEW RESTAURANT EQUIPMENT AND FIXTURES, LIGHTING AND HVAC INCLUDING COMMERCIAL COOKING AND EXHAUST SYSTEM I…
Filing mechanical application subsequent to primary job number X01186318-I1.
Interior renovation and address partial vacate order and violations # 35047792 n & 35049390 j and adding 3-pc bathroom in the basement and 2 split hvac units for first and second f…
Registered the boiler also replace hot water tank and new gaspiping from meter to boiler ,4th floor apartment 4b.
Registered the boiler also replace hot water tank and new gaspiping from meter to boiler ,4th floor apartment 4b.
Modify ductwork and install recovery units along with condensing units for coc per plans.
Installation of Navien combination boiler NCB-150 in cellar and new fixtures 1st and 2nd floor
Mechanical work filed in conjunction with the architecture application. no change to use, egress or occupancy.
Building #5: Provide loose lintel for louver opening of masonry wall repair and extend ex concrete pad. Provide boiler access platform
AT 7th AND 8th FLOORS: INTERIOR REMOVAL OF NON-LOADBEARING PARTITIONS, CEILINGS, FLOORING, AND FINISHES.REMOVAL ALL PLUMBING, ELECTRICAL AND HVAC EQUIPMENT. NO CHANGE IN OCCUPANCY…
Nycha boiler - plumbing work as per plans filed herewith. no change to use, egress or occupancy.