5,298 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Herewith filing for mechanical ductwork modification on 3rd floor as per plans filed herewith. no change in use, occupancy or egress.
Interior renovation and address partial vacate order and violations # 35047792 n & 35049390 j and adding 3-pc bathroom in the basement and 2 split hvac units for first and second f…
Filing for minor duct work in conjunction with the combination of the apartments.
All new Mechanical work for new apartments as shown on plans.
Installation of gas meters, gas meter riser & equipment and plumbing sink
AT 7th AND 8th FLOORS: INTERIOR REMOVAL OF NON-LOADBEARING PARTITIONS, CEILINGS, FLOORING, AND FINISHES.REMOVAL ALL PLUMBING, ELECTRICAL AND HVAC EQUIPMENT. NO CHANGE IN OCCUPANCY…
Renovation of existing basement, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters on base…
Abandon existing buried 7,000-gallon fuel oil storage tank. no change in use, egress or occupancy.
Modificagtion to existing mechanical system, diffuser, ductwork and related piping as shown on drawings. no change to use, egress or occupancy.
Mechanical work in conjunction with renovation of 5-story nycha multiple dwelling throughout: installation of new air-conditioning systems, ventilation systems and miscellanceous h…
Hereby filing for boiler replacement. no change to use, egress, or occupancy.
Filing mechanical application subsequent to primary job number X01186318-I1.
Mechanical work filed in conjunction with the architecture application. no change to use, egress or occupancy.
Installation of Navien combination boiler NCB-150 in cellar and new fixtures 1st and 2nd floor
Nycha boiler - plumbing work as per plans filed herewith. no change to use, egress or occupancy.
Replace of existing (3) HVAC units and (3) condensers. No change in use, egress or occupancy under this application.
Plumbing work related to boiler replacement. no change to use, egress, or occupancy.
Replace & install new boiler, new bathroom and plumbing fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Install new kitchen exhaust equipment and air conditioner units: install commercial hood, duct and exhaust system, new fresh air, installation of hvac system on 1st floor. no chang…
Registered the boiler also replace hot water tank and new gaspiping from meter to boiler ,4th floor apartment 4b.