5,298 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Interior renovation and address partial vacate order and violations # 35047792 n & 35049390 j and adding 3-pc bathroom in the basement and 2 split hvac units for first and second f…
Propose to provide MECHANICAL plans for existing 1 family 2 story building
Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy.
Installation of Mechanical System
Renovation of existing basement, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 2-pc restroom, washer, dryer,boilers and hot water heaters in base…
New mechanical system for new 4-story residential building.
NYCHA BOILERS Dyckman: Building 2: Site/Civil work in relation to boiler replacement as per plans filed herewith
Filing for mechanical work associated with interior demo of 2nd, 4th, 13th, 22nd, and 23rd floors as per plans submtted herewith.
Mechanical work filed subsequent to gc application #b01325653-s3
NYCHA BOILER: DYCKMAN. BUILDING 2: Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues an…
Mechanical work in conjunction with renovation of 6-story nycha multiple dwelling throughout: installation of new air-conditioning systems, ventilation systems and miscellanceous h…
NYCHA Boiler- Dyckman: Building 2: General Construction work to include Sealant, firestopping, patching, wall repairs in relation to Boiler replacement as per plans filed herewith
Mechanical modifications taking place on 10th & 11th floors as per plans filed herewith. No change in egress, use, or occupancy
INTERIOR BUILD-OUT OF COMMERCIAL SPACE (UG-6 / VI): MINOR PARTITION WORK, NEW RESTAURANT EQUIPMENT AND FIXTURES, LIGHTING AND HVAC INCLUDING COMMERCIAL COOKING AND EXHAUST SYSTEM I…
Mechanical work to include installation of units and ventilation as per plans filed herewith. No change to use, egress or occupancy.
Installation of cogeneration system. Installation of (1) new gas fired co generators and mechanical installations. No change in use, egress or occupancy.
INSTALLATION OF DUCTWORK DISTRIBUTION SYSTEMS Accessories ANDINSTALLATION OF NEW AS SPECIFIED ON PLANS HEREIN.
Mechanical work in conjunction with renovation of 5-story nycha multiple dwelling throughout: installation of new air-conditioning systems, ventilation systems and miscellanceous h…
Install new split air cooled HVAC units
NYCHA Boilers: Dyckman Building 2: Mechanical work in reference to boiler replacement as per plans filed herewith.