5,298 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Modifications to existing Mechanical Systems as per plans filed herewith. No change in use, egress or occupancy.
Installation of cogeneration system. Installation of (1) new gas fired co generators and mechanical installations. No change in use, egress or occupancy.
Mechanical work filed subsequent to gc application #b01325653-s3
Registered the boiler also replace hot water tank and new gaspiping from meter to boiler ,4th floor apartment 4b.
Boiler worktype filed subsequent to the NB GC application: B00766828-I1.
Installation of gas meters, gas meter riser & equipment and plumbing sink
Mechanical modifications taking place on 10th & 11th floors as per plans filed herewith. No change in egress, use, or occupancy
Plumbing work associated w/interior renovation of exg. 1-fam house including new and modified gas, storm, water/sanitary piping, and installation of (1) new direct vent condensing…
Hereby filing for boiler replacement. no change to use, egress, or occupancy.
HVAC work related to renovation of townhouse and change from two family to one. No change to use, egress or occupancy.
Modification to existing hvac system as per plans filed herewith. no change in use egress or occupancy.
Mechanical work filed in conjunction with the architecture application. no change to use, egress or occupancy.
INTERIOR BUILD-OUT OF COMMERCIAL SPACE (UG-6 / VI): MINOR PARTITION WORK, NEW RESTAURANT EQUIPMENT AND FIXTURES, LIGHTING AND HVAC INCLUDING COMMERCIAL COOKING AND EXHAUST SYSTEM I…
Install of temp platform, scenic sculpture & prod equip, no alt to exist structures for H&M Bloom. TPA required. Producer is responsible to monitor site safety. All production equi…
Modifications to the existing HVAC System: Installation of new ductwork, VAV's, FCU's and associated equipment on the 5th Floor as per plans (MUFG Renovations.) No change to use, e…
Install new split air cooled HVAC units
Install new kitchen exhaust equipment and air conditioner units: install commercial hood, duct and exhaust system, new fresh air, installation of hvac system on 1st floor. no chang…
Replace & install new boiler, new bathroom and plumbing fixtures in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Filing for removal of fan & ac units and associated piping/controls, replacement of existing ptac units, and installation of new hvac units along with piping and controls in apartm…
Herewith filing for mechanical ductwork modification on 3rd floor as per plans filed herewith. no change in use, occupancy or egress.