5,273 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Mechanical / hvac work as per the plans filed herewith.
Modifications to existing mechanical systems. no change to use, occupancy or egress
NYCHA BOILERS Dyckman: Building8: Civil/Site work as per plans filed herewith. No change to use, egress or occupancy.
X119- new exhaust fans, insulation for ductwork & piping.
Removing existing low pressure supply ductwork (downstream of existing fan powered terminal units) and replacing with new ductwork and diffusers for architectural layout.
NYCHA BOILER -Dyckman. Building 8: Plumbing work in relation to boiler replacement as per plans filed herewith.
Filing herewith mechanical work in conjunction with previously filed gc application # x01323551-i1
Removal of existing mechanical ventilation and hvac systems
Mechanical work for rennovation of existing Medex Ambulatory Health Facility / Ambulatory Diagnostic and Health Care Treatment Facility at this location. No change in use, egress,…
Application file to remove one violation of 39147200y. proposed plumbing work @ boiler room on partial cellar flr of an exist 2 story residential building. work involve installing…
Repairs on the boiler/oil tank room at the cellar floor as indicated on the plans filed herewith. no change in used, egress, or occupancy.
Mechanical changes as indicated on plans.
NYCHA BOILER -Dyckman: Building 8 Boiler replacement as per plans filed herewith,
Provide and install new heating, ventilation , cooling (hvac) system for first floor in existing offices building as per submitted mechanical plans. no change in use or egress or c…
2nd street-- mechanical modifications and installations for retail buildout.
NYCHA BOILER -Dyckman. Building 1. Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues an…
Installation of new hvac system throughout vacant space at ground floor level community facility management/daycare occupancy group e.
New bathrooms, kitchens, laundry plumbings fixtures and new piping. new mechanical room combination boilers.
Nycha boiler - structural work for interior renovation replacing concrete pads.
Modifications to existing mechanical systems. no change to use, occupancy or egress