5,273 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Modifications to existing mechanical systems. no change to use, occupancy or egress
Mechanical Work Proposed for a Single-Family Home. No Change to Use, Occupancy or Egress.
Replace portions of exist fin ceiling to accomodate ductwork replacements.as shown on plans. mechanical work for installation of new energy recovery ventilation (erv) system to be…
Mechanical work for rennovation of existing Medex Ambulatory Health Facility / Ambulatory Diagnostic and Health Care Treatment Facility at this location. No change in use, egress,…
NYCHA BOILER -Dyckman. Building 8: Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues an…
NYCHA BOILER -Dyckman. Building 1. Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues an…
Subsequent filing for support of excavation associated with the UST installation and use of mechanical construction equipment to lift, hoist and move material, earth and personnel…
TEST
TEST
NYPQ - Lab 9 - MECHANICAL MODIFICATIONS ACCORDING TO PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
Modifications to existing HVAC System as per plans filed herewith. No change in use, egress, or occupancy.
Mechanical work in conjunction with Legalization of (8) IMD units in accordance with article 7B of the Multiple Dwelling Law. IMD # 30157
Installation of a new exterior exhaust ducts and exhaust fan/mua fan, as per plans, no change in use, egress or occupancy.
Modification to existing HVAC system on the 2nd floor (Elevator lobby & corridor) as per plans. No change to use, egress or occupancy.
Modifications to the Mechanical Systems. Replacing two steam absorption chillers with two variable speed electric chillers. Also, replacement of condenser and chilled water pumps a…
Provide mechanical work for the 18th fl of an existing office building, work include installing ac indoor units, duct work and ventilation system. no change in use, egress, or occu…
Mechanical modifications to include erv installation andinstallation of associated ductwork and air outlets.
Installation of new hvac-r systems throughout building for hotel as per plans provided.
Install an eating and drinking establishment on the first floor. Work includes the installation of partition walls, counter, flooring and Mechanical Exhaust Hood. NO change in use,…
Scope of work includes the installation of the following HVAC work. Including using existing unit and Modify the air distribution system for the space. Replacing the existing hot w…