5,335 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Filing plumbing work in conjunction with mechanical filing replace existing boiler with 2 new boilers. No Change to use, egress or occupancy.
install new whsp supporting heating and future tenant cooling and install hydronic heating system as per plans
New electric heating and cooling system in apt 26. no change to use, egress or occupancy.
These drawings and specifications are for the installation of a gas fired water boiler at 215-10 Oceanside Ave, Breezy Point.
Pl applcation hereby filed in conjuction to job #b01263135-i1. cap and remove all waste, vent, water & gas piping from bsmt, 1, 2nd floors. cap & remove (1) boiler & burner with as…
Replacement(registration) of 2 condensing boilers with 1 hr fire enclosure in the 2 apartments on 002 and 003 in the existing 3 story mixed use building.no change in use, occupancy…
Replacement of diffusers on existing duct work. no change to use, egress or occupancy.
Mechanical modifications on 14th floor (construction) / 15th floor (marketing). no change to use, egress or occupancy.
Mechanical: Modifications to the existing HVAC system on the (23rd Floors- Orrick Buildout) as per plans. No change to use, egress or occupancy.
Interior renovation of existing 1-family building on cellar, 1st & 2nd floor. install new hvac and general construction work as per plan. no change in egress, use or occupancy.
Mechanical exhaust system for the existing kitchen on a second floor. No change of use, egress or occupancy.
New mechanical heating, ventilation & air-conditioning system.
Proposed 3 ton outdoor wall mounted mini split heat pump with (3) 1.5 ton indoor wall mounted indoor a/c units
Filing herewith for installation of Makeup Air Unit and related ductwork
Replace existing indoor and outdoor central HVAC system with a new indoor and outdoor split ductless HVAC system, including all associated controls and refrigerant tubing. No chang…
Propose mechanical modifications at 001 floor existing retail space. To install HVAC system all as per plans herewith filed. No change in egress use or occupancy filed under this a…
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 2-pc restroom, washer, dryer,and combined boilers in cellar; no chan…
PLUMBING APPLICATION FILED IN ORDER TO INDICATE CONNECTION OF GAS AND WATER LINES TO REPLACEMENT OF 2 BOILER AT EXISTING PROPERTY, LOCATED IN 2nd FLOOR SPACE
Interior renovation of cellar, basement, 1st & 2nd floor of exist. 2 story building. demolition work and construction work as per plan. install new hvac, partition, flooring, ceili…
Imc 9fl: modification of hvac equipment and ductwork to accommodate alteration to the behavioral healt unit as per plans. no change to use, egress or occupancy