5,335 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Interior fit-out of existing residential(floor 1) unit 1g proposed. remove and install non-bearing partitions, install mini-split air conditioning unit. no change of use and occupa…
Install new boiler and h.w.h. in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Proposed new mechanical system installation throughout the building, including associated equipment, ductwork, piping, etc as per plans
Renovation of existing cellar, 1st and 2nd floor with plumbing work:relocate kitchen and bathroom fixtures; new 2-pc restroom, washer,dryer, boilers and hot water heaters in cellar…
Proposed interior renovation of cellar, 1st & 2nd floor of existing 2 story building. new hvac, construction work as per plan, partition, flooring, ceiling and painting throughout.…
Installation of new hvac system associated with nb application filed under initial filing
Installation of new hvac system associated with nb application filed under initial filing
File plumbing work to cap/remove oil tank, oil boiler, install new gas boiler, and storage tank as per plan. no change in use, egress or occupancy.
File boiler work to install new gas boiler as per plan. no change in use, egress or occupancy.
Abandon 20,000 gallon fuel oil tank.
Install of temp platform, no alt to exist structures for Ralph Lauren Olympic Sculptures. A TPA not required. Producer is responsible to monitor site safety & implement HWAP. All p…
Proposed mechanical, HVAC subsequence to NB
Protection and Mechanical Methods for partial demo.
Addition and modifications to existing HVAC system and related ducts and piping. No change in use, egress or occupancy.
Filing for the removal of existing mechanical equipment as per plans filed herewith.
Mechanical specifications filed in conjunction with gc application x01269626-i1
Modifications of the existing HVAC system and associated ducts & piping on the 47th Floor, as per plans. No change to use, egress, or occupancy.
Herewith filing mechanical work as per plans. no change in use, egress or occupancy
RENOVATION OF EXISTING CELLAR, 1ST AND 2ND FLOOR WITH PLUMBING WORK:REPLACE KITCHEN AND BATHROOM FIXTURES; NEW 3-PC BATHROOM iN CELLAR AND 1ST FLOOR; NEW BOILER AND HOT WATER HEATE…
Modifications of the existing HVAC system and associated ducts & piping on the 46th Floor, as per plans. No change to use, egress, or occupancy.