5,335 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Mechanical modifications on 2nd floor as per plans filed herewith. no change in use, egress, or occupancy.
File boiler work to install new gas boiler as per plan. no change in use, egress or occupancy.
File plumbing work to cap/remove oil tank, oil boiler, install new gas boiler, and storage tank as per plan. no change in use, egress or occupancy.
Install new direct vents for gas-fired boiler as per plans. filing to address violations 39060923x, 39060929r, 39060933j, 39060927n, & 39060926l.no change in use, occupancy, or egr…
Installation of new hvac system associated with nb application filed under initial filing
Modifications of the existing HVAC system and associated ducts & piping on the 46th Floor, as per plans. No change to use, egress, or occupancy.
Mechanical application filed subsequent to Alt-CO; job number: B00903383-I1.
Plumbing application to install plumbing fixtures in a 3 story mixed use buiding. -installation of 1 bfpa as per dep approval(#25103530) on 001. -installation of 1 electric water h…
Interior fit-out of existing residential(floor 1) unit 1g proposed. remove and install non-bearing partitions, install mini-split air conditioning unit. no change of use and occupa…
New boiler room
Mechanical work for office fitout for Cumming Group on 12th floor
Replace three boilers.
Modifications of the existing HVAC system and associated ducts & piping on the 47th Floor, as per plans. No change to use, egress, or occupancy.
Filing for the removal of existing mechanical equipment as per plans filed herewith.
Install of temp platform, no alt to exist structures for Ralph Lauren Olympic Sculptures. A TPA not required. Producer is responsible to monitor site safety & implement HWAP. All p…
Proposed mechanical, HVAC subsequence to NB
Interior modifications in suite 1510 (liminal) on the 15th floor. includes removal of select existing ductwork and mechanical components, installation of new hvac distribution and…
Install new boiler and h.w.h. in the existing 2 story building. plumbing works as per plan. no change in egress, use, or occupancy.
Protection and Mechanical Methods for partial demo.
Proposed new mechanical system installation throughout the building, including associated equipment, ductwork, piping, etc as per plans