13,564 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Replacement of complete existing central heat and air system with or without duct work Install replacement of 4 Ton Heat Pump system
Replacement of complete existing central heat and air system with or without duct work
Remodel interior of building. ALMMG gutted building to remove asbestos lead and mold. APL is planning to put building back together after remediation of Existing Library. Square fe…
New single-story detached accessory structure 2 bed/2bath
Lehman village boiler upgrade, structural modifications as per plans. no change in use egress or occupancy.
NYCHA DYCKMAN BOILERS:Building 6: Plumbing work in relation to boiler replacement as per plans filed herewith.
NYCHA BOILER -Dyckman. BUILDING 5: PLUMBING WORK IN RELATION TO BOILER REPLACEMENT AS PER PLANS FILED HEREWITH
Install mechanical system for HVAC heating, cooling and exhaust for renovation of existing NYCDEP govt. building as per plan. No change in occupancy.
Modifications to the existing HVAC system on the 14th, 18th, 19th and 20th floors as per plans. No change to use, egress or occupancy.
File mechanical works as per plan in conjunction with job #: q01257156-i1.
Installation of new boiler in existing mechanical room. removing old boiler not in use. no change of use egress or occupancy.
Fitout of 3rd floor - supply, return, and exhaust ductwork. No change in use, egress or occupancy.
NYCHA BOILERS Dyckman: Building 5: Site/Civil work in relation to boiler replacement as per plans filed herewith
Mechanical work in conjunction with interior fit out of bank building
Installation of Mechanical HVAC equipment, ductwork, piping, vent and exhausts related to the enlargement.
Mechanical specifications filed in conjunction with gc application x01268871-i1
NYCHA Boilers: Dyckman Building 5: Mechanical work associated with Boiler replacement as per plans filed herewith.
Modifications to the existing mechanical system. No change in use, egress or occupancy.
Nycha dyckman houses, installation of temporary gas piping to connect (3) temporary mobile boiler trailers to provide heat during the heating season. no change in use, egress, or o…
Replacement of existing steam to hot water heat exchanger skid system; building footprint remains unchanged.