13,564 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Modifications to the existing HVAC system on the Cellar & 3rd floors (Harry Winston - Office Fit-out) as per plans. No change to use, egress or occupancy
SUPPLEMENTAL PERMIT TO #26016-70000-05258 TO REVISE WORK DESCRIPTION TO READ:1 Kitchen/1 Bathroom remodel for residential buildings (no structural changes)MECHANICAL, ELECTRICAL, A…
Mechanical specifications filed in conjunction with gc application x01268871-i1
modification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.
Alterations to 1-story building of existing laundromat. includes hvac, plumbing, and electrical.
Sc - 2019 cbrc - an interior tenant build-out within an existing 1-story retail building, per plans - existing restroom, mop sink & furnace to remain - exist rtu to be replaced wit…
NYCHA BOILERS Dyckman: Building 5: Site/Civil work in relation to boiler replacement as per plans filed herewith
Install mechanical system for HVAC heating, cooling and exhaust for renovation of existing NYCDEP govt. building as per plan. No change in occupancy.
NYCHA BOILER -Dyckman. BUILDING 5: PLUMBING WORK IN RELATION TO BOILER REPLACEMENT AS PER PLANS FILED HEREWITH
NYCHA DYCKMAN BOILERS:Building 6: Plumbing work in relation to boiler replacement as per plans filed herewith.
Lehman village boiler upgrade, structural modifications as per plans. no change in use egress or occupancy.
Installation of new boiler in existing mechanical room. removing old boiler not in use. no change of use egress or occupancy.
File mechanical works as per plan in conjunction with job #: q01257156-i1.
Installation of Mechanical HVAC equipment, ductwork, piping, vent and exhausts related to the enlargement.
Propose to install new boilers for the new building.
Change of a portion a retail to restaurant and added it to the adjacent restaurant space to become one restaurant, new mechanical equipment snd 3 new skylighte.
Replacement of complete existing central heat and air system with or without duct work Replacement of HVAC system with new HVAC system without duct work for Unit 127
Propose to install mechanical equipment as per plans filed herewith. No change in use egress or occupancy is proposed under this application
Install new hvac system for 7 stories mix-use building with cellar subsequent with dob now#q00710146.no change of use, egress and occupancy.
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 4bath]. Bldg 1