13,530 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
NYCHA BOILER -Dyckman: Building 3. Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flue.
NYCHA BOILER -Dyckman. Building 8: Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues an…
NYCHA BOILERS - DYCKMAN; Building 6 Structural work in relation to boiler replacement as per plans filed herewith. Concrete pads, Post installed anchors and support for new Flues a…
NYCHA Boilers: Dyckman: Building 6: General Construction in relation to boiler replacement as per plans filed herewith. No change to use, egress or occupancy.
NYCHA Boiler- Dyckman: Building 2: General Construction work to include Sealant, firestopping, patching, wall repairs in relation to Boiler replacement as per plans filed herewith
NYCHA Boilers: Dyckman Building3: Mechanical work in association with Boiler Replacement as per plans filed herewith. No change to use, egress or occupancy.
Removal of existing ductwork and installation of mechanical equipment and ductwork as shown on drawings filed herewith. Alt-CO filed under M01185872. OT, SP and PL work filed separ…
NYCHA Boilers: Dyckman: Building 1: Mechanical work in relation to boiler replacement as per plans filed herewith. Replacing exhaust fan and adding a steam unit heater
A/c change out
NYCHA BOILER -Dyckman. Building 1: General Construction associated with boiler replacement as per plans filed herewith.
NYCHA BOILER -Dyckman: Building 1. Civil/Site work in relation to boiler replacement as per plans filed herewith
NYCHA Boilers: Dyckman Building 2: Mechanical work in reference to boiler replacement as per plans filed herewith.
Rapid Review-Standard-Building Construction:9255/Towne Centre - UNIVERSITY; Building, mechanical, electrical, and plumbing permits for interior tenant improvements to the 7th floor…
NYCHA Boiler: Dyckman: Building 4: Architectural work to include Sealant, firestopping, patching, wall repairs in relation to Boiler replacement as per plans filed herewith
NYCHA BOILERS Dyckman: Building8: Civil/Site work as per plans filed herewith. No change to use, egress or occupancy.
Hvac chg out
Relocat a/c unit
Remove (1) oil tank and (1) boiler; Install (2) boiler, (2) H.W.H., (1) sump pump, (1) ejector pump, (1) lavatory and (1) water closet in the Cellar. No change in use, occupancy or…
Filing for mechanical systems work as per plans