13,498 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
A/c change ventilt
HVACHOMES
Lidl chelsea - filing herewith for the mechanical work related to a store fit out. there will be no change in use, eggress or occupancy under this appplication.
Beeville 2980-HC201-L New 1-Story Single Family Residence with (3) bedrooms (2) bathrooms Attached Garage Covered Patio & Porch & Cafe
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applica…
Modification of HVAC system as per plans filed herewith.
Afton 2981-HC202-L New 1-Story Single Family Residence with (4) bedrooms (2) bathrooms Attached Garage Covered Patio & Porch Cafe
Galloway 3312 B Left New - 1 Story SFR CONDOMINUM w/ 3 bedrooms 2 bathrooms attached 2 car garage covered entry porch and patio FFE: 688.98 Site Plan: SP-2021-0328C Site Plan Exp.:…
Relocate two (2) existing 275- gallon fuel oil storage tanks. install new oil-fired hot water heater as per plans. no change in use, egress or occupancy.
Mechanical modification pipe expansion
Installation of mechanical systems for proposed 18 story mixed use building with cellar.
Mechanical work on the 12th floor as per plans. No change in occupancy, use or egress.
Complete work done under previously expired permit #_14010-10000-01519_. Work is 75_% complete(Minimum 75% percent completed as determined by inspection).Including HVAC, Plumbing,…
Mechanical work as shown on plans filed herewith. No change in use, occupancy, or egress.
Replace boiler and oil burner.
Replacement of complete existing central heat and air system with or without duct work
To replace hvac units with mechanical work for apt# 7b& 7d as per plan filed herewith. no change of use, egress or certificate of occupancy.
Retrofit (1) existing combination gas/oil burner on (1) existing low pressure boiler. no change in means of egress use group or occupancy.
Replacement of complete existing central heat and air system with or without duct work hvac change out
Installation of new gas boiler in cellar apt 1E as per plans filed herewith. No change in use, egress and occupancy.