14,177 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Replacement of complete existing central heat and air system with or without duct work
*Green Building* New 1-story 4 bedroom 2 bathroom single family residence with attached garage covered front porch and rear covered patio.
Herewith file mechanical plans for Apt #7F to remove existing fan coil units, locate 2 new condensers, provide indoor air handlers and new toilet exhaust systems, remove existing T…
Install of temp tents, platforms, truss & prod equip, no alt to exist structures for Annual Winter Village at Bryant Park. TPA required. Producer responsible to monitor site safety…
New Construction Of A Concrete Tilt-Wall Cold Dark Shell Warehouse With Associated Site Work (4) Applications
1.install domestic hot water heater system, domestic hot/cold system/piping, sanitary/vent piping, gas piping, and storm drainage system/piping. 2. install new ejector pumps for ce…
Replacement of complete existing central heat and air system with or without duct work Brett LaBissoniere
Mechanical work filed in conjunction with Alt-1 application #121206630
Filing herewith drawings to install new exhaust ducts for proposed gas dryers. this application does not require a new or amended certificate of occupancy as there is no change in…
NYCHA Boiler Building # 2 Natural Gas piping will be running underground from gas meter room and domestic hot water heater rooms
New construction of a 2 story single family residence with attached garage and covered porch. 5/4.5 Reference approved PUD: C8 2018-0171.2B.SH
Install of temp retail & service kiosks, no alt to exist structures for Annual Marketplace at Bryant Park. TPA not required. Producer is responsible to monitor site safety & implem…
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 5 ton horizontal gas system
Installation of new ducted water source heat pump unit connected to the building's cooling tower & related ductwork & piping as per the drawings filed herein.
Installation of mechanical cooling, ventilation and heating system for FDNY Engine Company 159 including kitchen rangehood exhaust system, as shown on plans. No change of use, egre…
Mechanical work as per plans filed
Herewith filing mechanical modifications in conjunction with tunnel connector to 12 east 89th street per plans. no change in use, occupancy or egress under this application.
new mechanical work in conjunction with the main ot #B01149835-I1
Early-phase Mechanical modifications to fan powered boxes and fans on Floors 24 through 26. Construction costs and filing fees included in full-floor Mechanical job # M01293926-S1.…
Mechanical modifications of the existing system. Associated ducts and piping, and relocation of the existing AC unit. No change to use, egress or occupancy.