21,664 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of temporary const. plywood fence and heavy duty sidewalk shed as per plans. sw shed and plywood fence shall comply with chapter #33 of the 2022 code. no change in use…
Prop. 8 ft. high plywood fence & access gate along property lines, pursuant to bc 3307.7 & building bulletin 2009-010 in conjunction with alt co application for existing one-family…
Filing curb cut as per plans associated with Alt-CO job #X01194505-I1.
Construction modifications taking place on the 7th floor as indicated on the drawings.
Two story, two family residence with two on-site parking pads.
Unlimited owner reveals + same-day permits
Pro lifts the 10/month cap, drops the 7-day freshness delay, and lets you export any search to CSV. $79/mo for the first 100 subscribers.
Two story, two family residence with two on-site parking pads.
Installation of construction fence to protect public from work areas.
Installation of construction fence to protect publicfrom work areas.
new shoring drawings for the detention tank which is filed with BCC is filled correctly in conjunction with our main job number Q00956028
Propose foundation system, composed of spread footings and mats with strap beams and concrete foundation walls. Cast-in-place columns shall be poured monoloithically with FO walls,…
Installation of construction fence to protect public from work areas.
Filing for civil work related to concrete pad placement.
Filed herewith; 8' o.s.b construction fence
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Subsequent filing for st&fo work in conjunction with gc job#s01038536-i1.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Installation of a Temporary Construction Fence as per the plans filed herewith. No change to Use, Egress or Occupancy.
Installation of pipe scaffold for ps 131q at 170-45 84 avenue, queens in conjunction with alt# 421902338, q01101060, q01101064, q01103002 as indicated on plans. there will be no ch…
Installation of a temporary wooden construction fence