21,664 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Filing for pumps for replacement of domestic hot water system per plans filed herewith. all pl and gc work to be filed under separate applications. no change to use, egress or occu…
Installation of temporary ramp per plan. no change in use, egress, or occupancy
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy…
Construct a one-family attached residence with accessory built-in two car garage.
Two story, two family residence with two on-site parking pads.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Resolve ecb violation: 39163022k; install new awning with canvas cover at store front reading health essential association as per plan. no change in use, egress, and occupancy.
Sprinkler & standpipe specifications filed in conjunction with gc application x01197447-i1
General Construction to take place on the 25th floor as per drawings filed herewith. No change in use, egress, or occupancy.
Installation of material hoist
Installation and use of temporary construction fence as per plans filed herewith. no change to use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of construction fence to protect public from work areas.
Installation of construction fence to protect public from work areas.
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with thi…
Filing for new concrete pad installation related to the replacement of the hot water equipment per plans filed. no change to use, egress or occupancy.
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. sidewalk shed and pipe scaffolding shall comply with chapter #33 of the 2022 code no change in use, egress o…
Filing for new concrete pad installation related to the replacement of the hot water equipment per plans filed. no change to use, egress or occupancy.