22,072 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of 2022 the nyc…
Installation of a temporary needle beam per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
application filed for temporary construction fence
Prop. 8 ft. high plywood fence & access gate along property lines, pursuant to bc 3307.7 & building bulletin 2009-010 in conjunction with alt co application for existing one-family…
Structural modifications to floor 1 as per plans filed herewith. No change in use, egress, or occupancy.
Installation of temporary chute per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
Remove part of ceiling and reconfigure access panel in mech closet. Provide new suspended ceiling. New access panel. No change in use, egress or occupancy
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Temporary structures for a red carpet at JRP plaza. Removed at the end of the programing. No changes to existing structures, use or egress.
Facade restoration, inspections
MPP # 157, ARVERNE EAST. Open Parking Lot establishment associated with Q00858246.
Sprinkler & standpipe specifications filed in conjunction with gc application x01197447-i1
Installation of sidewalk shed and construction plywood fence as per plans. temporary equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy…
Installation of heavy duty sidewalk shed as per plans. shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of a heavy duty sidewalk shed as per plans. sidewalk shed shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary const. plywood fence and heavy duty sidewalk shed as per plans. sw shed and plywood fence shall comply with chapter #33 of the 2022 code. no change in use…