21,891 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Structural work filed in conjunction with combination of apts 1505 (14th fl) with apt ph (15th fl). structurally frame proposed convenience stair opening between 14th & 15th floors…
P.S. 004-K: CIVIL WORK-The scope of work includes site grading, drainage, underground utility connections, stormwater management facilities/practices, pavement, fencing, site furni…
Existing opening to be infilled with new metal deck and steel framing.
Temporary plywood construction fence at front yard in conjunction with general construction dob now job number m01207733-i1. no change to use, egress or occupancy.
Installation of a temporary wooden construction fence
Filing 5 story mixed-use building with community facility and 17 dwelling units
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
File suspended scaffold outrigger systems for facade restoration and inspection.
Application for the installation and use of mini-crane as per plans filed herein. No change in egress, use, or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Legalize 1 story storage building as per plan.
Subsequent structural application filed herewith.
Proposed temporary 8' high construction fence @ side yard and rear yard. this job will be filed in conjunction with job#b01217621-i1. and this job is filed to resolve violation #39…
Installation of temporary heavy duty sidewalk shed and pipe scaffold as per plans. no change in use, egress or occupancy.sidewalk shed shall comply with chapter #33 of the nyc buil…
Sistering of the existing floor joists at all floors, new reinforced concrete step-footing in cellar and new reinforced concrete retaining wall at rear yard. No change in use, egre…
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Construction work on the 10th floor (Dubin & Co.) as indicated on drawings.
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this app…
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes,chapter 33. no change in use, egress or occupancy.
Installation of temporary construction fence for ps 131q at 170-45 84 avenue, queens in conjunction with alt# 421902338, q01101064, q01101069, q01103002 as indicated on plans. ther…