21,891 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Proposed vertical and horizontal enlargement of an existing 2-story two-family building to 4-story three-family mixed-use building as per plan. obtain a new certificate of occupanc…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Installation of temporary stair tower as per plan. no change in use, egress, or occupancy.
Proposed canopy
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
[HUB ACCEPTED] Modification of existing sprinkler system for tenant fit out of (5) residential units, filed in conjunction with GC worktype under 'I1'
Installation of new sidewalk shed for ps 209q at 16-10 utopia parkway, queens as indicated on plans. there will be no change in the use, egress, or occupancy under this application…
Slab opening and new stair from the 20th floor to the 21st floor (HIGHLIFE) AS PER PLANS. No change to use, egress or occupancy
Filing for temporary construction fence. no change in use,egress or occupancy.
A proposed structural filing in conjunction with alt-co job #: m01285183-i1.
Installation of 8' temporary construction fence
Installation of a temporarily heavy-duty sidewalk shed and supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress an…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Sistering of the existing floor joists at all floors, new reinforced concrete step-footing in cellar and new reinforced concrete retaining wall at rear yard. No change in use, egre…
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…