21,891 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Job filed to comply with violation #s 38272546H;38272547J 1) To remove stagellift at first floor restaurant 2) Add Non-FAR enlargement adding a utility room at first floor restaura…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of temporary suspended scaffolds per plan submitted. work shall comply with 2022 building code chapter 33. no change in use, egress and/or occupancy with this applicat…
Sidewalk shed installed per plans , no change in use, egress or occupancy
Herewith filing architectural work for lobby and facade modifications per plans . no change in use, occupancy or egress under this application.
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Installation of a temporary wooden construction fence
General construction work filed to install a chain-link fence surrounding located within the property line. no change to egress, use or occupancy.
Installation of temporary debris chute as per plan. no change in use, egress, or occupancy.
PS004K- Environmental, and Sub-Slab Depressurization System (Sub-Slab Soil Exhaust System)-SSDS
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
P.S. 004-K: CIVIL WORK-The scope of work includes site grading, drainage, underground utility connections, stormwater management facilities/practices, pavement, fencing, site furni…
Installation of sidewalk shed for public protection during construction work
Vertical & horizontal extension of existing one family. obtain new c of o
Herewith filing for Structural modifications as per plans. No change to use, egress or occupancy.
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Legalize 1 story storage building as per plan.
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…