21,891 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Structural work in conjunction with gc# b01219243-i1
Installation of 8' temporary construction fence
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
new shoring drawings for the detention tank which is filed with BCC is filled correctly in conjunction with our main job number Q00956028
Installation of temporary construction fence per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this applicat…
Is 34 r - installation of +/- 342 linear feet of temporary chain link construction fence 8' high with green netting in conjunction with bis dob# 500876545 submitting on behalf of c…
IRA Rope Access Facade Inspection
Installation of 300psf sidewalk shed as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under this application.
Installation of 300 psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under t…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of 2022 the nyc building code. no change in use, occupancy, or egress under this a…
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of temporary supported scaffold per plan submitted. Work shall comply with 2012 building code chapter 33. No change in use, egress and/or occupancy with this applicati…
Sprinkler & standpipe specifications filed in conjunction with gc application x00688341-i1
Sistering of the existing floor joists at all floors, new reinforced concrete step-footing in cellar and new reinforced concrete retaining wall at rear yard. No change in use, egre…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
Installation of 300psf sidewalk shed and pipe scaffolding as per plans. all equipment shall comply with ch #33 of the nyc code 2022. no change in use, occupancy or egress under thi…
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Installation of 8' temporary construction fence
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.