21,891 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Structural work in association of B01322470-I1 Application. Job filed to comply with violation #s 38272546H;38272547J 1) To remove stagellift at first floor restaurant 2) Add Non-F…
Installation of temporary sidewalk shed as per plans. sidewalk shed shall comply with chapter 33 of the 2022 nyc building code. no change in use, egress or occupancy under this app…
Proposed installation of temporary pipe scaffold as per plans. work shall comply with chapter #33 of the nyc building code. no change in use, occupancy, or egress under this applic…
New concrete foundation and footings
Installation of temporary personnel hoist as per plans. no change in use, egress or occupancy.
herewith filed for an 8 ft plywood construction fence
Structural work filed in conjunction with alt-co.
Installation and use of temporary supported scaffold as per plans filed herewith. no change in use, egress, or occupancy.
Installation of suspended scaffold for facade work or inspection . Amending by adding scaffold drops
Installation of temporary sidewalk shed as per plans. no change in use, egress or occupancy.
Installation of single personnel/material hoist in accordance with nycc 2022 chapter 33 building code. no change in egress, use, or occupancy.
Installation of construction plywood fence, heavy duty sidewalk shed and overhead protection shed as per plans during construction. no change in use, egress or occupancy. temporary…
Installation of the new concrete pads for mech. equipment in tank rooms. installation of new concrete area ways at tank rooms. extension of existing sump pit.
Filing for civil work related to concrete pad placement.
Installation of construction fence to protect publicfrom work areas.
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of temporary heavy duty sidewalk shed as per plans. no change in use, egress or occupancy. sidewalk shed shall comply with chapter #33 of 2022 the nyc building code. l…
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Installation of temporary stair tower as per plan. no change in use, egress, or occupancy.