21,559 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Exterior storm pipe
Plumbing work filed in conjunction with triplex apt renovation. no change in use, occupancy, or egress.
Relocate 2 sinks, 2 wc's, 2 lavs, 2 showers, 2 ranges 2 new dw's , 2 new washers
Modifications to existing Plumbing and Sprinkler System as per plans filed herewith. No change in use, egress, or occupancy.
Modification and installation of plumbing fixtures, and replacement of gas range with gas cooktop.
File plumbing work at existing 3-story residential building to remove gas fixtures, plumbing fixtures, install new plumbing fixtures and gas appliances as per plan. no change in us…
Plumbing work in conjunction with tenant fit out
Removal of existing Kitchen service sinks; Relocation of water closet and lavatory; Installation of a new WC & lavatory, and bar station hand sink
removal of fixtures as per plans
Repair or in-kind replacement of 0 plumbing fixtures as described in permit application. includes repair or replacment of plumbing piping. locations: 0 residential unit(s), 1 non-r…
Proposed 1 story accessory building, front gate/fence, and in-ground pool and hot tubu serving an existing 2 story sfr, per plans. note: accessory building is to have no plumbing o…
Proposed demolition and installation of new plumbing fixtures throughout the first(1) and second (2) floor. No change to use, occupancy or egress under this application.
Modification to existing plumbing fixtures as per plans filed herewith. No change in use, egress or occupancy under this application.
Plumbing specifications filed in conjunction with gc application x01268871-i1
Modifications to plumbing fixtures and related piping as shown on drawings. No change to occupancy use or egress.
Plumbing work associated with the interior renovation of the kitchen area only in apartment #9a including modification of fixtures, drain, and water/ sanitary lines. no change to u…
Filing for new bathroom fixtures on the 1st and 2nd floors, washer/dryer installation on the 1st floor, and radiator relocation. No changes to use, egress, or occupancy.
Plumbing work includes removal of exisiting lavatory and Water closet; installation of new sinks, a dishwasher, new gas line.
Modifications to the existing plumbing system on the floors 11 through 15 (CWNY) as per plans. No change to use, egress or occupancy
Plumbing, Sprinkler and Standpipe drawings filed in conjunction with NB application B01186301-I1