22,223 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Fence installation in conjunction to the ALT-CO application #B01250416-I1
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Application here with filed for horizontal enlargement of existing two framed dwelling.
Installation of battery energy storage system (ess) in osp as per plans. ess system is located in an enclosed area with no accessory use, therfore, must be filed as alt-co
Installation of a temporarily supported scaffold and heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress an…
Filing for temporary supported scaffolding. No change in use, egress or occupancy.
Remove and replace library and gymnasium airconditioning systems
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
General Construction filing for removal and replacing material of all related parapet work as per drawings, No change of Egress, use or Occupancy.
Installation of temporary debris chute as per plans. no change in use, egress or occupancy.
Proposed installation of heavy duty sidewalk shed as per plans. live load 300 lbs per square feet. sidewalk shed shall comply with chapter #33 of the nyc building code. no change i…
Temporary (8) feet high wood fence in conjunction with application #420200473. No change in use, occupancy or egress.
Suspended scaffold installation as per plans filed herewith.
Proposed installation of a temporary sidewalk shed as per plans submitted. work shall comply with 2022 building codes, chapter 33. no change in use, egress or occupancy.
Sheeting-Shoring-Excavation for underground utilities as well as general work (goal posts, scoreboard, etc.)
Installation of temporary personnel material hoist as per plans. no change in use, egress or occupancy.
Filing for temporary shed.
Installation of 300 psf sidewalk shed as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under this application.
Installation of temporary pipe scaffold as per plans. no change in use, egress or occupancy.
Structural work for 4 story concrete building.