13,618 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Addition and/or Alterations - EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached…
Install/replace tempstar furnace
Two new boilers and two new hot water heaters with associated ducts and piping.
General-Expedite-Building Construction:5810/Lauretta - **SCOPE CHANGE (4/30/2025)** LINDA VISTA. Building, mechanical, electrical & plumbing permits for (N) 3-story MDU consisting…
Installation of 5 mechanical units as per plans filed. No change in use, egress or occupancy.
Mechanical work for ARCH on marketing floors 30 & 31 (construction floors 29 & 30)
General-Express-Building Construction:5998/Alcala Park (Usd) - LINDA VISTA: Building, mechanical, electrical and plumbing permits: The project consists of alterations to the first…
New ducts. new unit
New ducts. new unit
Minor alteration
Scope of work includes the replacement of gas boilers and associated piping and ductwork.
General-Express-Building Construction:12780/High Bluff - CARMEL VALLEY: Building, Electrical, Mechanical, and Plumbing for the proposed interior tenant improvement for one tenant o…
Hvacmodel 3466a
Replacement (1) new combination gas/oil burner on (1) existing low pressure boiler. no change in means of egress use group or occupancy.
A/c disconnect
General-Expedite-Building Construction:2049/Franklin - SOUTHEASTERN SAN DIEGO: Combination building permit to remodel an (E) single-story SDU existing 1-story SDU (front) into two…
General-Expedite-Building Construction:5810/Lauretta - **SCOPE CHANGE (4/30/2025)** LINDA VISTA. Building, mechanical, electrical & plumbing permits for (N) 3-story MDU consisting…
Filing for Mechanical Systems modification including the removal of existing duct, piping, equipment and the installation of new duct, piping and equipment as shown per plan. No ch…
Modifications to the existing HVAC system on the 27th floor as per plans. No change to use, egress or occupancy.
Install new gas-fired furnace as per plans. install new dehumidifier and fresh air ductwork to mechanical room. remove existing gas-fired boiler. install new chimney liner in exist…