14,152 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
New ducts. new unit
Installation of air conditioning units for the Elevator machine room. No change in use egress and occupancy.
New ducts. new unit
4th floor mez - control room upgrade - removal and installation of machines and related ductwork
Lglze a/c replace
Changeout 5-ton a/c
A/c changeout 5ton
Connect to existing gas piping for replacement boiler and reinstall existing gas burner as per plans. no change in use, egress or occupancy.
Mechanical changes as indicated on plans.
Boiler replacement as a subsequent in conjunction with M00674188- I1 BE to add the 2nd boiler information .NO change in Use,Occupancy or Egress .
Install VPHPs and associated ductwork and install VRFs, replacement of all existing gas and fuel fired heating and ventilation appliances in the school building with new electric p…
New ducts. new unit
Installation of mechanical system and related piping as shown on drawings. no change to occupancy use or egress.
Subsequent filing to Legalization filing of boiler & HWH replacement (X00844223-I1) to make as-built corrections to plans
Replace existing 100% outside air air handling units along with associatedappurtenances to improve store conditions as shown on the plans. connect toexisting ductwork and hot water…
Modifications to mechanical ductwork and related piping as per plans. No change in use, egress or occupancy.
Installation of a multi-split ductless heat pump system with one outdoor unit and two indoor units
STRUC/ELEC/PLMB/MECH - COMMERCIAL TI - Building
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 ton horizontal gas system