14,152 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Replace existing 100% outside air air handling units along with associatedappurtenances to improve store conditions as shown on the plans. connect toexisting ductwork and hot water…
Boiler replacement as a subsequent in conjunction with M00674188- I1 BE to add the 2nd boiler information .NO change in Use,Occupancy or Egress .
Replacement of complete existing central heat and air system with or without duct work YOO
Change of use to convert existing 2nd story above existing garage to create duplex use (existing electrical and plumbing will be used for kitchen conversion)
Mechanical modifications taking place on the 1st floor (lobby) as per plans filed herewith. Scope of work is limited to the removal & installation of ductwork, diffusers, electric…
New 7 story total 5 levels 102 units apartment type iii a over 1st & 2nd floor type i a, and 2 levels of garage basement type i a including 14 units for very low income units per 1…
Installation of air conditioning units for the Elevator machine room. No change in use egress and occupancy.
Spr 2019 crbc: rooftop hvac replacement with structural reinforcement (occupancy class b; construction type iv)
Install new gas-fired furnace as per plans. install new dehumidifier and fresh air ductwork to mechanical room. remove existing gas-fired boiler. install new chimney liner in exist…
install mini split system on addition
Interior Remodel for Existing Office - Suite 300
Modifications to existing mechanical systems as per plans filed herewith. No change in use, egress or occupancy.
Mechanical changes as indicated on plans.
ePlan: Commercial Expedited Review - Interior Remodel to Existing Admin Office Areas. Phase12-A.
New construction of 1 story SFR with 2 bathrooms and 3 bedrooms
Modifications to mechanical ductwork and related piping as per plans. No change in use, egress or occupancy.
Replacement of complete existing central heat and air system with or without duct work
Repair/replacement affecting 1 systems : 1 rooftop packaged unit(carrier, 30rc-055561---0-0, roof) . electrical work under this permit = no . locations: 0 residential unit(s), 1 no…
Tenant improvement to include general construciton and mechanical work (duct work only) at this location. No change in use, egress, or occupancy under this application.
Convert oil boiler to gas boiler for existing 2 family house in the cellar; no change in use, egress or occupancy under this application.