14,152 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Mechanical work filed in conjunction with work on basement level.
New In Ground Pool w/ autofill/heating system
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3 ton horizontal gas system
Replacement of furnace only Garage attic.
Replacement of complete existing central heat and air system with or without duct work 4-TON CONDENSER CHANGE-OUT IN BCKYARD & 88K BTU FURANCE CHANGE-OUT IN ATTIC
Garage Apartment only addition remodel
A mini-split air conditioner will be installed in the garage area 4 electrical outlets will be added a 220V outlet for a sauna 2 lights and a switch will be added. A prefabricated…
Scope: nonstructural interior replacement of floors, 200 sq ft of drywall and replace acoustical tile with new, supply duct relocation. locations: 0 residential unit(s), 1 non-resi…
Replacement of complete existing central heat and air system with or without duct work YOO
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 Ton Horizontal Heat Pump (Unit #6)
1.LEGALIZE 3PC BATH( LAV, TOILET, SHOWER), REPLACEMENT OF 2 GAS BOILERS, REMOVE 2 GAS HWH's, CAP & REMOVE 2 GAS STOVES & 2 RESI-SINKS & 1 3PC BATH AT CELLAR. 2. REMOVE 1 GAS STOVE…
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2 ton vertical gas system (Downstairs)
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 Ton Vertical Gas System
eplan: Anchorage of Mechanical parking system for new apartment under building permit application number 21010-10000-03139.
Connect to existing gas piping for replacement boiler and reinstall existing gas burner as per plans. no change in use, egress or occupancy.
Change of use to convert existing 2nd story above existing garage to create duplex use (existing electrical and plumbing will be used for kitchen conversion)
Interior Remodel for Existing Office - Suite 300
ePlan: Commercial Expedited Review - Interior Remodel to Existing Admin Office Areas. Phase12-A.
New construction of 1 story SFR with 2 bathrooms and 3 bedrooms