14,055 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Replace existing ceiling and gypsum board throughout the dining area, and replace the exhaust duct and install new 4'-3wx16'-0l fire suppression system in kitchen on first floor ex…
Rapid Review-Standard-Building Construction:3111/Camino Del Rio North - MISSION VALLEY: Building, mechanical, plumbing and electrical permits for a proposed partial floor and commo…
A/c exact changeout
Rapid Review-Standard-Building Construction:11375/El Camino Real - TORREY HILLS; Building - Mechanical, Electrical, and Plumbing Permits. For the proposed non-structural interior t…
General-Standard-Building Construction:8012/Paseo Del Ocaso - LA JOLLA; Combination, building, mechanical, electrical, and plumbing permits for (2) (N) ADUs to an (E) MDU. First AD…
Mechanical modifications related to new demise taking place on the 35th floor (36th floor Marketing) as indicated on the drawings.
Filing for installation and registration of 6 new boilers. no change in use, egress or occupancy.
Complete work done under previously expired permit #_18047-20000-00419__. Work is 75_% complete(Minimum 75% percent completed as determined by inspection).Including mechanical
Nycha east river boilers consisting of mechanical work as per plans filed herewith. no change to use, egress, or occupancy.
Plumbing work at cellar level: removal of kitchen and shower, and installation of slop sink and two piece bathroom. Installation of a new gas meter to serve existing boiler and hot…
Mechanical specifications filed in conjunction with gc application q01261212-i1
Subsequent filing for plumbing work install boiler room, kitchen & bathroom, and install sprinklers in basement. no change in use, egress, or occupancy.
Rapid Review-Standard-Building Construction:3111/Camino Del Rio North - MISSION VALLEY: Building, Mechanical, Electrical, Plumbing permits for tenant improvement on the 7th floor o…
Work includes per the filed plans installation of air conditioning, modification of toilet exhaust work for new bathrooms, install air cooled condensing unit for elevator machine r…
Renovation of cellar mechanical room - nycha boilers. work includes install new louvers-replace doors & frames-miscellaneous site work, including areaways-replace finishes
Rapid Review-Standard-Building Construction:101/Broadway - DOWNTOWN: Building, Electrical, Mechanical and Fire permits for professional certification of office tenant improvement t…
To install a boiler and water heater in existing boiler room at cellar. this application is filed in conjuction with m00844755 and to supersed previous laa 122315903..
This subsequent document is administrative in nature in order to be able to obtain COC's in DOBNOW for mechanical units. All work/floor plans are submitted under the main MS filing…
Mechanical for new elevator addition and ADA upgrade