3,978 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Interior demolition of non load bearing partitions on the 17th floor as indicated on drawings.
Demolition and shoring drawings for CMU bearing walls at first floor existing of 4 story residential structure. Steel frame stabilization system. Repair of existing internal bearin…
Standard-Demolition:3060/Carmel Valley - CARMEL VALLEY: Demolition permit for the propose demolition of a 2417sf commercial building. Closed Discretionary PRJ-1054862. Historic cle…
Hand Demo of 1 1/2 Story Detached House, 23' High
Application is filed for interior demolition andrenovation in cellar that doesn't affect use, egress oroccupancy of the space, and therefore, no new or amendedcertificate of occupa…
Structural demolition/modifications on Floor 2 and associated shoring on Floors 1 and 2. No change in egress, use or occupancy
Minor demolition with intallation of new partitions, doors, suspended ceilings and finishes on the third (3rd) floor, apt. 3f as per plans. no change to use, egress or occupancy.
Filing application for minor non-structural demolition and construction in cellar portion of duplex commercial unit. All work as per plans filed herewith. No change in use, egress…
Demolish existing split unit, and provide new vrf ststem to existing office space.
Structure fully demolished under HPD & DOB IED.
3 story wood frame building to be fully demolished with hand tools only. Mechanical equipment to be used for debris removal, truck loading, and crushed slab on grade.
DEMOLITION
DEMOLITION
Supported scaffold installation for interior demolition and ground plaza demo means and methods. no change in use, egress or occupancy.
Total demo of sfr 1528 sqft circa 1950
Demolition of non-load bearing paritions, intallation of new partitions, doors, suspended ceilings and finishes on the eighth (8th) floor, apt. 8a as per plans. no change to use, e…
Application is filed for interior demolition andrenovation in cellar that doesn't affect use, egress oroccupancy of the space, and therefore, no new or amendedcertificate of occupa…
Demolish existing split unit, and provide new vrf ststem to existing office space.
Total Demo of pool 470 sqft
Demolition of detached carport. remove parking per ab 2097.