13,661 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
New ducts. new unit
STRUC/ELEC/PLMB/MECH - COMMERCIAL TI - Building
STRUC/ELEC/PLMB/MECH - COMMERCIAL MISCELLANEOUS - Building
STRUC/ELEC/PLMB/MECH - COMMERCIAL REMODEL - Building
STRUC/ELEC/PLMB/MECH - COMMERCIAL REMODEL - Building
STRUC/ELEC/PLMB/MECH - COMMERCIAL REMODEL - Building
STRUC/ELEC/PLMB/MECH - COMMERCIAL REMODEL - Building
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work Install replacement of 2 Ton Heat Pump System
*eplan* interior alteration tenant's improvement and change to use from liquor store to beauty shop. (1) new partition walls, plumbing, electrical, mechanical works. (2) new equipm…
interior remodel kitchen walls to be removed main bath replace fixtures bath 2 replace fixtures remove load bearing wall replace gas water heater with tankless remove replace elect…
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
To file BE work type to install boiler at the cellar. No change in use, egress or occupancy under this application.
Spr- 2019 cbc-interior renovation of existing two (2) dwelling units first floor unit to be duplexed to existing basement, second floor unit to remain, only new furnace to be added…
Interior remodel 3rd floor areas in existing admin office building. Inspector noticed deficiencies in shell HVAC systems and required modifications for compliance.
ePlan: Residential Expedited Review - New construction of a 3-Story Single Family Res. [3bed 3.5bath] with attached Carport. Bldg 1
(1) Bathroom remodel for residential buildings (no structural changes)INCLUDING COMBOs (ELECTRICAL, PLUMBING & HVAC)
Existing boiler to be replaced with combi boiler @ 2nd flr residence, relocated 3 plumbing fixtures of bathroom-2, kitchen sink @ 2nd fl residence, heating and hot water @ cellar.…
Removal of two (2) existing boilers and installation of two (2) two boilers in existing boiler room.
Filing Plumbing work to for a new natural gas service to transition boiler plant from fuel oil to dual-fuel.