5,010 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Spr 2019 cbrc: full building permit for 3 story, 3 dwelling unit building with 3 on-site parking spaces and a 2-story rear wood porch, new 6'-0" wood fence & 5'-0" iron wrought fen…
2019 cbrc spr. convert 1st floor commercial space from smoke shop (retail for czo, occupancy use group m) to new cafe (occupany use group b), for existing 3 story brick building wi…
Proposed repair of ceiling collapse in event space at Cellar level
Installing a new hatch for access to a crawl space from the exterior of the building.
(day 3) renovation of kitchen including removal of nonloadbearing partitions, renovation of exterior service entrance and ancillary spaces as shown on plans. window replacement wit…
The addition of split ac heat pump systems and energy recovery ventilation to serve the space
New in ground pool and spa
Interior tenant fit out to existing vacant commercial space. work include general construction and mechanical work. no change to use egress or occupancy.
THE STRUCTURAL WORK AS PER PLANS FILED HEREWITH INCLUDES INSTALLATION OF CONCRETE SUPPORTS FOR GROUND MOUNTED 5MW (22MWh) ENERGY STORAGE SYSTEM AND STRUCTURAL STEEL FRAMING SYSTEM…
Dds 2019 cbc: full building permit for 4 story 9 d.u. building with crawl space, 1st floor retail, 4 car garage at 1st floor, deck at 2nd/3rd/4th story, elevator over-run, entire b…
Dds 2019 cbc: full building permit for interior alteration to level 2 and 3 of the existing three story building. no work to be performed on the first floor (existing offces, cafe,…
Exterior Facade repairs per plans filed including: Removal & replacement of masonry units & parapet coping. Masonry repointing. Restoration & reinforcement of existing steel spandr…
Self-cert 2019 cbrc: first time build out of 23rd floor office space as per plans. work to include construction of non-load bearing partitions, ceilings, finishes, and associated m…
ePlan: Grading for new pool and spa.***2 of 2***
New pool and spa (autofill/heated)
ePlan. Interior non-structural remodel to portion of office building to add partition walls and create new office spaces (1567 s.f.)
Change of Use - Nail Spa space remodeling.
ePlan: Residential Expedited Review - Interior remodel only - converting half bath into full bath pushing out wall to expand kitchen converting 1 bath into 2 full converting garage…
Interior alterations of existing commercial space to include partition and finishes work. no change to use, occupancy or egress
ePlan: Expedited Review - Interior Remodel to an existing Retail Space (10290 SF).