3,978 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Demolition - Interior
Demolition - Interior
demolish rear structure to comply with nov #202423506. convert e) fl bath to utility room & storage room. expand storage @ 1st fl, infill on the room and post. install exterior wal…
EZ Interior Non-Load-Bearing Wall Demo. - EZ INTERIOR NON-LOAD-BEARING WALL DEMOLITION - For the interior demolition on NON-Load-Bearing partition walls and ceilings as per attache…
Application is filed for the demolition of wood deck located in the backyard of the property. no change in use, egress or occupancy. all work as per plans submitted herewith.
Interior renovation to include demolition and construction of partitions in an existing office space. No change is use, egress, or occupancy.
Partial demolition and reframing for new slab openings and partitions. Associated structural reinforcement. No change to use, egress, or occupancy.
Exterior renovation to include demolition of existing and construction of new partitions in Storefront - Retail D Space for existing office space. no change in use, egress, or occu…
Standard-Demolition:4172/Combe - UNIVERSITY: Demolition / Removal Permit for the demolition of a 4ft deep pool for an existing SDU. RS-1-7. HREA
Temporary bracing and partial demolition of 5 story building, as per plans filed herewith. This application is filed in conjunction with DOB#322109525.
Full Demolition of 1 story commercial building
Interior renovation to include demolition and construction of partitions in an existing office space. No change is use, egress, or occupancy.
Photo studio-- interior demolition inclusive of partitions removals as per plans filed herewith. no change to use, egress, or occupancy.
Interior demolition on existing one (1)- family, two (2) story brick residential building with cellar. work on cellar and 1st floor only. no change in use, means egress or occupanc…
The proposed demolition is for 2 story masonry garage attached to another garage located within our property that is not attached to residential building. It's not attached to the…
Interior non-structural demolition as shown on the plans.
HUB CONSULTATION ACCEPTED. This job is filed for partial demolition work at 134-19 Northern Blvd, Queens NY 11354, In conjunction with AltCO job# Q01175010-I1
Full hand demolition of a 1-1/2 story frame building using handheld devices. foundation to be removed using mechanical means
Interior demolition of non load bearing partitions on the 20th floor as indicated on drawings.
installation of construction fence to protect site during full demolition