10,873 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Enterior renovation to 1st floor retail and 2nd floor apartment. and addition of safetyrailing. no change to use, egress, or occupancy.
Filing herewith for installation of Exhaust Fan and Precipitator serving Kitchen on 1st floor (STK Grace)
Repair Facade, replace Storefront & Windows to comply with LPC requirements. No change in Use, Occupancy and Egress.
Renovation of existing two family house in cellar, 1st and 2nd floor; repair deck and steps, replace windows, skylight, partitions, flooring and ceiling. no change in use, occupanc…
Installation of hoist for facade repair & inspection.
Repair steel columns in cellar, replace damaged concrete slab(200 sf)
Restoration of water-damanged interior partitions and floor & ceiling surface materials from floors cellar, 001-004. no structural work. there is no change to use, egress, occupanc…
Partial modification of the part of the non-bearing partitions and refurbish interior finishes at the 3rd-floor office. No change in use, egress, or occupancy.
Interior renovation of apartment 4d. no change in use, egress, or occupancy.
REMOVE PARTITIONS & FINISHES, INSTALL NEW PARTITIONS & FINISHES. NEW DROPPED DRYWALL CEILINGS WITH POST-INSTALLED ANCHOR SYSTEMS. KITCHEN RELOCATED TO WET BAR LOCATION. LAUNDRY ROO…
Storefront modifications for new retail store- includes new entry door and security glazing
Interior renovation apartment 2c of existing 4 story building. construction work as per plan. install flooring, ceiling and painting throughout. no change in egress, use, or occupa…
Removal and installation of interior non-bearing partitions and related finishes as per drawings filed herewith. no change in use, egress, or occupancy.
Suspended scaffold outrigger system for exterior inspection
Exterior facade restoration as per plan. no change in use egress or occupancy.
Suspended scaffold outrigger system for exterior inspection
Filing change of use to reduce the existing office and create two new dwelling units at the 1st floor. Work includes removal and installation of interior non load bearing partition…
Filing sp for work related to interior alteration and fitout of 2nd floor of assembly restaurant
Interior and exterior renovation of existing 3-story building as shown on plans. No change to use or occupancy.
Masonry facade repairs as per plans. No change in use, egress or occupancy.