12,495 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
1 bathroom(s).Bathroom remodel for residential buildings (no structural changes).Kitchen remodel for residential buildings (no structural changes).
Add sill plate anchor bolts, add plywood to cripple walls (if existing), and replace foundation per L.A. City Standard Plan #1 (Earthquake hazard reduction per Chapter 92 of the Lo…
Kitchen/bathroom (2 ) remodel for residential buildings (no structural changes)."COMPLY WITH DEPARTMENT ORDER effective date 08/03/2021. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DA…
Supplemental permit to 25014-20000-00687: revise plans to remove storage and rebuild in lieu of conversion
Eplan. Foundation retrofit per engineering design.
Addition and remodel to a kitchen in a single family dwelling.
Supplemental permit to update address.
Eplan. addition and remodel of existing single family dwelling with garage and new trellis
Supplemental permit to 20014-20000-03132 to revise floor plan
Supplemental permit to 25016-20000-35434 to revise title 24 to omit all electric building and revise door & window schedule on floor plan
6--Window and 1-door change-out (same size & type) for residential buildings. Dual glazing, labeled andcertified by National Fenestration Rating Council (NFRC), is required for doo…
Supplemental for new pantry, revised east elevation windows, and new second-story window railings per egress requirements.
1 bathroom(s).Bathroom remodel for residential buildings (no structural changes).
Water damage, termite damage/ dry rot repair less than 10% of replacement cost of residential buildings.
SUPPLEMENTAL PERMIT FOR 21010-20000-00192 TO ADD (N) DECK (IRR 63'-8" X 20', 1270SF) ON PILES TO SFD W/ ATTACHED GARAGE, BASEMENT & ADU **ePlan**
Supplemental to 21010-10000-06511 to correct scope of work description to:(n) 2-story detached adu. no fee- dept error
Tenant improvement to (e) office
ePlan: REMODEL TO CREATE AN ADDITIONAL BEDROOM AND BATHROOM IN THE SECOND STORY UNIT OF THE EXISTING APARTMENT BUILDING
5 door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified byNational Fenestration Rating Council (NFRC), is required for doors and windows…
2 bathroom(s).Bathroom remodel for residential buildings (no structural changes).