5,354 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of 7.92 kw solar energy system on roof. No change of occupancy, use or egress.
Re-piping gas lines to eight (8) rooftop hvac units and a gas stove in basement.
Laundromat demolition. work includes remove concrete pads, non-bearing partitions, doors, duct work below roof and ceiling tile patch.
Facade repairs including limestone repairs and replacement, brick replacement, window sill replacement, cut and pointing at missing or deteriorated mortar joints, limestone sill re…
partial removal and restoration of roof assembly to allow for removal & installation of new dunnage & hvac equipment; partial removal & restoration of masonry wall to allow for rig…
work includes repair of north facing exterior wall and fire damage to the roof. NO CHANGE IN USE OR OCCUPANCY
Filing herewith tax abatement application for installation of roof-mounted solar panels. no change in use, egress, or occupancy.
Rooftop solar installation. no change to use, occupancy or egress.
Modification to existing Verizon site on the roof. Replace 4 antennas and 6 RRH units. Install new equipment cabinet and extension of existing platform. No change in use, egress, o…
Structural repair to existing house as follows: first floor rear kitchen area - floor & ceiling joists (separation area) & roof above. second floor - sister floor joists throughout…
Q440- Replacement of Slate Roof Tiles, Repointing and Interior finishes repairs.
Proposed interior and exterior renovation on cellar, 1st floor thru 5th floor, and roof as per plan. convert to two-family. obtain new certificate of occupancy.
Re-piping gas lines to eight (8) rooftop hvac units and a gas stove in basement.
ST: Remove Portion of Building Facade and Portion of Existing Roof / Floor Slabs. Provide new concrete, steel, and masonry construction. No change in Use, Occupancy, or Egress.
Removal and replacement of existng roof systems, work around elevator pit, removal and rebuilding of parapets, replacment of windows and window gaurds, concrete work and interior r…
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
test
Laundromat demolition. work includes remove concrete pads, non-bearing partitions, doors, duct work below roof and ceiling tile patch.
Remove and replace existing RTU's and HVAC equipment's, remove all exhaust fans, new roofing membrane, new exhaust fan, steel dunnage on top of existing thought-out roof, and dunna…
Installation of 7.92 kw solar energy system on roof. No change of occupancy, use or egress.