5,167 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
remove existing roof finish & install bitumen torch w/hot work
reroofing: flat roof; remove all flat roof modified torch down & reroof using modified torch down roofing membrane gta throughout the roof area.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
reroofing overlay bitumen s/a. no torch down. amend to 202510278244 & 202511149675.
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
apply flexible crown saver over existing chimney crown to seal cracks. waterproof structure above roofline with water repellant. attach custom cap to top of chimney: replace in kin…
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
reroofing no hot work
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
rear structure (carriage house) new roofing, in-kind skylight replacement @ the existing locations, removal of window, 1 replacement window to be installed in the same location; re…
remove tar & gravel roof, install modified bitumen roof, hot work
remove low slope roof & install modified bitumen roof. remove composition shingle roof & install new composition shingle roof, hot work
reroofing no hot works
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
re-roofing: remove and replace roofing material / existing roofing material (in-kind)
NEW 2 -STORY SFD AND ATTACHED ADU PER GC 66323(a)(1) OVER BASEMENT AND WITH ROOF DECK ON TOP.- BLDG SPRINKLERED THRU-OUT. "Construction shall not commence without CALOSHA permit".
Standard- Mechanical/Electrical/Plumbing Standalone:2007/Avenida De La Cruz - SAN YSIDRO; Electrical Permit to install a 7.92 kW DC (11.5 kW AC) roof-mounted PV system (18 modules)…