Q440- Replacement of Slate Roof Tiles, Repointing and Interior finishes repairs.
Remove and replace existing RTU's and HVAC equipment's, remove all exhaust fans, new roofing membrane, new exhaust fan, steel dunnage on top of existing thought-out roof, and dunna…
Installation of pv system on existing roof top. no changes to the use egress or occupancy.
test
Removal and replacement of existng roof systems, work around elevator pit, removal and rebuilding of parapets, replacment of windows and window gaurds, concrete work and interior r…
ST: Remove Portion of Building Facade and Portion of Existing Roof / Floor Slabs. Provide new concrete, steel, and masonry construction. No change in Use, Occupancy, or Egress.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Exterior facade masonry repairs, replacement of damaged brick, window sills, window lintels and replacement of select masonry roof parapets.
Filing for installation of refrigeration equipment complete with condensers, evaporators and piping. install water heater flue pipe and combustion air duct from cellar mechanical r…
Structural plans for enlarged fourth floor, propose new roof, steel stairs and change flooring of all levels from wood joists to light gauge steel.
Solar installation on E house roof in conjunction with Alt-Co application Q01129003-I1
General construction to take place on the 11th floor Roof as per plans filed herewith. No change in use, egress, or occupancy.
Provide temporary shoring at the fifth and sixth floor levels to support existing wood joists framing at the existing fire damaged roof assembly to ensure structural stability.
Structural repair to existing house as follows: first floor rear kitchen area - floor & ceiling joists (separation area) & roof above. second floor - sister floor joists throughout…
Proposed interior and exterior renovation on cellar, 1st floor thru 5th floor, and roof as per plan. convert to two-family. obtain new certificate of occupancy.
installation of solar panels, rooftop, railed, grid-tied, 7 modules, 2.87 kw
Rooftop solar installation. no change to use, occupancy or egress.
Party wall-tie back and water proofing / parging at exposure 4, in-conjunction with immediate emergency declaration (ied) full demo of adjacent lot
Laundromat demolition. work includes remove concrete pads, non-bearing partitions, doors, duct work below roof and ceiling tile patch.
Re-piping gas lines to eight (8) rooftop hvac units and a gas stove in basement.