5,402 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Scaffolding and needle beams installation at the exterior facades and supported scaffold inside the elevator and stair shafts from the 3rd floor to the roof level.
Rooftop solar installation. no change to use, occupancy or egress.
A.rebuild east garage wall as per plansb.reinforce and brace roof framingc.repoint cmu wall as neededd.resolve oath/ecb violation no. 35685606re.resolve dob violations:e.a.v 091725…
Replacement of [2] 20ton roof units on the roof of an exisiting 1 story commercial building
APPLICATION FILED HEREWITH FOR INTERIOR RENOVATION WITH FACADE, ROOF SHINGLES, PLYWOOD, RAFTERS,WINDOWS AND INTERIOR PARTITIONS REPLACEMENT TO THE REFERENCED (2) TWO STORY WITH CEL…
Installation of solar panels on roof. no change in use, egress, or occupancy.
VERIZON - Relocate/replace 6 antennas & 6 RRHs, relocate 3 MDBs, install 1 RRHs, remove 3 ballast frames, remove 4 cabinets from existing platform and install 1 new cabinet. All wo…
File plumbing work type in conjunction with general construction workapplication job#b01188632-i1install new plumbing fixtures at cellar 1st thru 4th floor and roof.
Remove and replace 17 existing roof drains and Reflash 35 existing vent stacks, relocate & Reflash 5 vent stacks and extend 26 vent stacks 46 min. above roof . as per plans.
Ps 139q - patching of interior partitions and walls, patching at roof to support hvac equipment replacement. no change in use, egress or occupancy.
Ps 139q - replace 12 rooftop hvac units. no change in egress, use or occupancy.
Provide new sleeves and link seal fittings at water service piping sanitary piping and fresh air intake piping as shown on drawings remove and reinstall piping as shown on drawings…
Filing herewith foundation work on the cellar and structural work on the 1st through the 3rd floor and roof. no change in use egress or occupancy. filied in conjunction with applic…
Installation of photovoltaic solar array on existing roof system as per plans
Please assign to hub cdu. filing to create new occupancy for accessory passive recreation terrace on roof (og r-2, ug ii). replace existing rooftop pavers. no change to use, bulk o…
Installation of photovoltaic solar array on existing roof system as per plans
Installation of solar panels on roof. no change in use, egress, or occupancy.
Removal of interior non-load bearing partitions and related finishes on subcellar one floor through roof level. There is no change in use, egress or occupancy as part of this appli…
Installation of 300 psf sidewalk shed and roof protection as per plans. all equipment shall comply with chapter #33 of the 2022 code. no change in use, egress or occupancy under th…