13,661 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
ePlan: Residential Expedited Review - New THREE UNIT RES. Bldg 1: New construction of a 3-Story Single Family Res. [3bed 3.5bath] with Attached Carport.
ePlan: Residential Expedited Review - New THREE UNIT RES. Bldg 2: New construction of a 3-Story Single Family Res. [3bed 3.5bath] with Attached Carport.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 3.5 Ton Horizontal Gas System
New construction single-family residential 2-story 4 bedroom 3 bath with attached 2-car garage covered front porch and covered rear patio.
Hvac filing for 2-family residential house
Mechanical modifications to the 6th floor as per plans filed herewith. No change in use, egress, or occupancy.
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
Addition/ interior remodel of existing 2-story single-family residential to include: enclosing existing screened porch to extend kitchen; IR of kitchen and utility room.
Interior remodel to existing restaurant with dining room addition.
Replacement of complete existing central heat and air system with or without duct work
Interior Remodel to existing 2 story structure. [7 Day Review]
Application filed to replace existing hvac equipment as per plans filed herewith.no change in existing ductwork or air terminals.
2048 Sq. Ft. of Mechanical Building part of the overall 149695 Sq. Ft. new YMLA school bond program. The space will be used as the mechanical building.
ePlan: Residential Expedited Review - New THREE UNIT RES. Bldg 3: New construction of a 2-Story Single Family Res. [3bed 2.5bath] with Attached Carport.
Replacement of complete existing central heat and air system with or without duct work LIKE FOR LIKE: 2.5 Ton Vertical Heat Pump System
Relocation and redistribution of existing HVAC and bathroom exhaust systems as per plans filed herewith. No change in use, egress, or occupancy.
Interior renovation. Convert existing tubs to showers. Replace all existing counter tops cabinets and fixtures and equipment with new. Replace all existing gypsum boards with new.…
Replacement of complete existing central heat and air system with or without duct work Replacing a 3 ton gas system.
mh work on the 11th floor (12th floor marketing) remove existing outdoor condenser & indoor ahus w/ducts. install new hvac. install new indoor units on existing slab. install outdo…