13,618 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separateexpress electrical permit for new pool luminaire is required, when applicab…
Mechanical work in conjunction with application# Q0107288-I1
ePlan: Commercial Expedited Review - Interior Remodel of Existing Space (798 SF)
Replace existing pre-fabricated fireplace with the same size and in the same location. Installation shall be as per manufacturers recommendations. A HVAC permit is required.
Installation of (1) air conditioner unit, (2) erv and minor mechancial work as per plan
Construct an industrial building (Boeing) occupy per plan. Mechanical is included.
New construction single-family residential 2-story 4 bedroom 3 bath with attached 2-car garage covered front porch and covered rear patio.
Express: Fire damage repair
Install new air conditioning system in Apartment 4F, including (1) outdoor condensing unit, (3) indoor air handling units, refrigerant piping, drainage, and control system. All wor…
Herewith filing mechanical work as per plans.
Two new boilers and two new hot water heaters with associated ducts and piping.
Repair/replacement affecting 1 systems : 1 floor furnace(heil n96msn0801716a closet) . electrical work under this permit = no . locations: 1 residential unit(s), 0 non-residential…
ePlan: Residential Expedited Review - New construction of a 2-Story Single Family Res. [4bed 4.5bath] with Attached Carport. Bldg 2
New 2 story SFR 3 bed 2.5 bath and attached garage
Complete work done under previously expired permit #_12014-20000-02784__. Work is _90_% complete(Minimum 75% percent completed as determined by inspection).Include Electrical, Plum…
mechanical work as per plans filed
Replacement of exhaust pipe for HVAC equipment. The structural work consists of providing supports for the exhaust pipe.
Mechanical modifications taking place on 37C/38M and 38C/39M as per plans filed herewith. No change in use, egress or occupancy.
Replacement (1) new low pressure boiler. replacement (1) new combination gas/oil burners. change grade of fuel oil from #4 oil to #2 oil. no change in means of egress use group or…
Installation of new hvac & erv systems associated with nb application filed under initial filing