10,090 permits match your filters. Drill down by trade, ZIP, or flag only the ones without a contractor on file.
Filing herewith plans and application for a new 2nd story vertical and horizontal extension with 2 story front addition. interior renovations on the first floor. plumbing to be fil…
Application filed herewith to relocate (1) res.sink, (1) stove, and (1) dishwasher as well as add (1) residential sink at first floor.
Propose subsequent plumbing work filed in conjunction with nb job #b00764297-i1
Provide Five story School with Cellar including new water services sanitary, vent, and storm piping systems. Cellar is provided with sewage ejector.
Plumbing work as shown on plans filed herewith.
Filing for the plumbing work in conjunction with the renovation work to combine two apartments.
Installation of plumbing fixtures and sprinkler heads as shown in plans filed herewith.
Plumbing work as shown on plans
Plumbing work filed in conjunction with GC application. No change to use, egress or occupancy.
Plumbing and sprinkler work for existing one family house and garage.
partial plumbing work for istallation of new building sewer as per DEP site connection approval, DOB inspection for sewer line steel sleeve through foundation wall.
Modification of plumbing fixtures and sprinkler system as per plans filed herewith, no change in use, egress or occupancy under this application.
File plumbing work to remove oil tank, replace gas, plumbing fixtures, and install new gas fixtures as per plan to address oath/ecb #35656700k. no change in use, egress or occupanc…
Partial plumbing work , building main sewer line as per dep approved site connection, dob inspection for steel sleeve through foundation wall.
Partial plumbing work , building main sewer line as per dep approved site connection, dob inspection for steel sleeve through foundation wall.
Plumbing work for cellar mechanical room
partial plumbing work for istallation of new building sewer as per DEP site connection approval, DOB inspection for sewer line steel sleeve through foundation wall.
Plumbing work as per plans filed herewith.
Plumbing mofication for the replacements of the nyu hospital backflow prevention devices. no change in use, egress or occupancy.
Plumbing work in conjunction with the ot